BOSTON
PUBLIC
LIBRARY'
DRAFTPROJECTIMPACTREPORT
for
144-150 Boylston Street
Boston, Massachusetts
September 198828,
i.-rir^
f(
>^
-V,^^
Submitted to:
ArchitectsBOSTONREDEVELOPMENTAUTHORITY
JUNG/BRANNENASSOCIATES, INC.
Submitted by: Geotechnical Consultants
FOX/LDD PARTNERSOFBOYLSTONSTREET HALEY&ALDRICH, INC.
47 Winter Street
Environmental ConsultantsWeymouth, Massachusetts 02189
HMMASSOCIATES, INC.DRAFT PROJECT IMPACT REPORT
FOR
144-150 BOYLSTON STREET
BOSTON, MASSACHUSETTS
September 28, 1988
Submitted to:
BOSTON REDEVELOPMENT AUTHORITY
Submitted by:
FOX/LDD PARTNERS OF BOYLSTON STREET
47 Winter Street
Weymouth, Massachusetts 02189
Architects
JUNG/BRANNEN ASSOCIATES, INC.
Environmental Consultants
HMM ASSOCIATES, INC.
Geotechnical Consultants
HALEY & ALDRICH, INC.TABLE OF CONTENTS
Page
SUMMARY I-lI. PROJECT DESCRIPTION AND OF IMPACTS
1.0 Site Location and Surroundings I-l
2.0 Project Description I-l
1-73.0 Summary of Impacts
II-lII. SCOPING DOCUMENTS
III-lIII. GENERAL INFORMATION
Information III-l1.0 Applicant
2.0 Financial III-4
3.0 Project Area III-4
4.0 Relocation Information III-7
5.0 Employment Plan III-8
6.0 Public Benefits III-8
Controls and Permits III-97.0 Regulatory
III-98.0 Community Groups
III-l9.0 Affirmative Housing Plan
IV-1IV. TRANSPORTATION COMPONENT
IV-11.0 Introduction
IV-22.0 Parking
3.0 Loading IV-5
4.0 Access IV-6
5.0 Vehicular Traffic IV-7
6.0 Public Transportation IV-21
7.0 Pedestrian Circulation rV-23
8.0 Access Plan IV-24
2406-10/1509E -i-4
TABLE OF CONTENTS (Continued)
Page
ENVIRONMENTAL PROTECTION COMPONENT V-1V.
Wind V-1I.O
2.0 Shadows V-17
3.0 Air Quality V-46
4.0 Geotechnical Impacts V-58
Noise V-605.0
Control V-626.0 Rodent
VI. URBAN DESIGN COMPONENT VI-1
Development VI-11.0 Summary of Proposed
Reviews VI-202.0 History of
3.0 Development Schedule VI-20
VII. HISTORIC RESOURCES COMPONENT VII-1
1.0 History of the Project Area VII-1
2.0 Ratings for Existing Buildings VII-2
3.0 Project Impacts VII-3
VIII. INFRASTRUCTURE SYSTEMS COMPONENT VIII-1
1.0 Introduction VIII-1
2.0 Sewer and Water Service VIII-2
3.0 Electric Power Service VIII-1
APPENDICES
A TRAFFIC LEVEL OF SERVICE CALCULATIONS A-1
B WIND DEFINITION B-1
C AIR QUALITY C-1
2406-10/1509E -ii-