ShawCor Secures a Second Pipe Coating Contract for the Ichthys LNG Project PR Newswire TORONTO, June 29, 2012 TORONTO, June 29, 2012 /PRNewswire/ -- (TSX: SCL.A, SCL.B) ShawCor Ltd. (TSX: SCL.A, SCL.B) today announced that its pipecoating division, Bredero Shaw, has received a contract with a value in excess of US$100 million from McDermott Australia Pty. Ltd. to provide pipeline coatings and related products and services for the flowlines and tie-in spools for the Ichthys LNG Project. This is the second contract Bredero Shaw has received for the Ichthys LNG Project and is in addition to the contract for the gas export pipeline announced on February 14, 2012. The Ichthys LNG Project is a Joint Venture between INPEX (Operator) and Total. Gas from the Ichthys Field, in the Browse Basin approximately 200 km offshore Western Australia, will be gathered using the risers and flowlines and will undergo preliminary processing at the offshore central processing facility to remove water and extract condensate. The gas will then be exported via an 889 km subsea pipeline to the onshore LNG facility to be located at Blaydin Point, Darwin, Northern Australia. The Ichthys LNG Project is expected to produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak.