EQHSMS (IMS) Awareness Training Presentation
10 pages
English

EQHSMS (IMS) Awareness Training Presentation

-

Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres
10 pages
English
Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres

Description

EQHSMS(IMS) Awareness Training Presentation provides Introduction and Overview to IMS(EQHSMS) system, Environmental and OHSAS, Definitions Environment aspects-impact, ISO:9001-2008 requirements in detail, ISO:14001-2004 requirements in details and IMS(EQHSMS) documentation.

Informations

Publié par
Publié le 28 juin 2013
Nombre de lectures 11
Langue English

Extrait

V
isit us
at
www.globalmanagergroup.com
E ma
il:
  
sales@globalmanagergroup.com
 Tele:
 +91-79-2656 540
5
Integrated management system EQHSMS integration
Business planning
Quality management system
Health and safety management system
Energy management system
Risk management system
Maintenance management system
Personnel and administration systems
Performance management systems
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
Inputs for objectives
Quality and HSE policy Continual improvement commitment Prevention of pollution commitment and Health and safety issues Initial review results (aspects / risks) Legal and other requirements Technology options Financial, operational and business requirements Views of interested parties Results of management review
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
Steps for aspect identification
Institute a core team Define procedure & scope Evaluate activities, products, processes, services,work situations, product life cycle, past experience, existing practices & procedures Identify items and all loss exposures Determine impact (N / A / E) & liabilities List activity/item Quantify activity/item Determine priority
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
4.3.1 Hazard / risk identification
Institute a core team Define procedure & scope Evaluate activities, products, processes, services, work situations and product life cycle, past experience Identify items and all loss exposures Determine hazards and risk List concerns Quantify concern Determine priority
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
Common control methods
Air contaminant
 1. Elimination 2. Isolation 3. Substitution 4.Ventilation 5. House keeping 6. PPE 7. Air monitor
  Skin disorders
1. Elimination 2. Isolation 3. Substitution 4. Engineering control 5. PPE 6. Personnel placement
Noise
1. Reduction at source 2. Noise barrier 3, Dampening 4. PPE 5. Engineering control 6. Personal  replacement
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
Structure of standards as per ISO 14001-2004
4.5Checking & corrective action Monitor & Measure Non-conformance Corrective/preven ive actions Records Audits
4.6Manag e me n re vie w
4.4 Implementation and operation • Structure / Responsibility • Training, Awareness Communication • EMS Documentation • Document Control Operation Control Emergency Procedures
onme licy
4.3Planning Environmental  Aspects Legal & Other •Objectives & Targets EMP
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
Structure of standards
ISO 14001 Standard
4.2 Environment policy 4.3 Planning 4.4 Implementation &  operation 4.5 Checking &  corrective action 4.6 Management review
OHSAS 18001 Standard
4.2 OHSAS Policy 4.3 Planning 4.4 Implementation &  operation 4.5 Checking &corrective  action 4.6 Management review
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
IMS(EQHSMS) Documents
Admin & safety
Medical/HRD
IMS Manual
IMS Procedures manual
Work instruction/SOPs
Registers / Records
Purchase & Production Q.A. & ETP stores
Despatch
Packing
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
Steps for installation of integrated management system (EQHSMS)
Conduct ISO:9001,ISO-14001 AND ohsas:18001 awareness program (top + middle + bottom level). Form a steering committee and task force for documentation Identification of all possible environmental aspects; hazard-risk to the company. Brainstorming on impacts of all possible aspects and significant risk. Identification of most significant aspects and significant risk Define quality and HSE policy, objectives and targets. Prepare documents of integrated management system, records, legal requirements. Train all for quality and HSE policy and for achieving objectives & targets. Communication to all including suppliers and interested parties. Implementation & train all personnel in the use of procedures & formats. Preparation and implementation of IMS programme. Train internal auditors for IMS system. Assess the system through first internal audit. Take corrective actions for non-conformities. Apply for certification. Assess the system through second round of internal audit. Avail onsite document adequacy of certifying body for Integrated management system. Take actions on suggestions given by them. Final audit by certifying body for your integrated management system.
Visit us at www.globalmanagergroup.com E mail: sales@globalmanagergroup.com  Tele: +91-79-2656 5405
  • Univers Univers
  • Ebooks Ebooks
  • Livres audio Livres audio
  • Presse Presse
  • Podcasts Podcasts
  • BD BD
  • Documents Documents