Integrated Management System Training Presntation
10 pages
English

Integrated Management System Training Presntation

-

Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres
10 pages
English
Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres

Description

EQHSMS- Integrated Management System Auditor Training Presentation kit provides Internal audit process, ISO:9001-2008 requirements in detail, Internal Audit process flowchart and audit documentation and
Undertaking audits using case studies."

Informations

Publié par
Publié le 28 juin 2013
Nombre de lectures 8
Langue English

Extrait

V

isit us

at

www.globalmanagergroup.com

E ma

il:

sales@globalmanagergroup.com

Tele:

+91-79-2656 540

5

Eight principles of ISO: 9001 – 2008.

Visit us at
www.globalmanagergroup.com
E mail:
sales@globalmanagergroup.com
Tele: +91-79-2656 5405

1.
2.
3.

Tips to trained internal auditor

Auditor is always fact finder and not fault finder.
As per IMS(EQHSMS) auditor looks for effectiveness of
system, process approach and not only records.
Auditors 4 Key boundaries
a. ISO:9001, ISO;14001 and OHSAS:18001 Requirements
b. Own written documents
C. Customer requirements
D. Statutory & regulatory requirements
4. Audit methodology
A. Interview people
B. Verify records
C. Witness testing/ process checking
D. Own verification of process / product parameters

Visit us at
www.globalmanagergroup.com
E mail:
sales@globalmanagergroup.com
Tele: +91-79-2656 5405

IMS(EQHSMS) AUDIT

As per iso system, audit is define as “ a systematic &
independent examination to determine whether ims(eqhsms) activities
and related results comply with planned arrangement and whether
these arrangements are implemented effectively and are suitable to
achieve the objectives .

(1)

(2)

Adequacy audit:- (System or management audit)
Determine the extend to which the documented system (ims(eqhsms)
manual, procedures, work instructions & forms) adequately meet the
requirements of standard.
Compliance audit:-
Which seeks to establish the extent to which the documented system is
implemented and observed by the work force.

Visit us at
www.globalmanagergroup.com
E mail:
sales@globalmanagergroup.com
Tele: +91-79-2656 5405

l




1
.
.


Au
d
i
i
t

p
l
a
n

2
.
.


Deve
l
l
op


check
l
l
i
i
s
t
s

i i
3
.
.


Open
i
ng

meet
i
ng

4
.
.


Gather


ev
i
i
dence

Au5
.
.


R
ecord


re
su
l
l
ts

idi ttse6
.
.


C
l
l
os
i
i
n
g


meet
i
i
ng

sp7
.
.


Au
d
i
i
t


r
e
p
ort

Visit us at
www.globalmanagergroup.com
E mail:
sales@globalmanagergroup.com
Tele: +91-79-2656 5405

Non – compliance reporting



What is the problem ?

Describe clearly, concisely and

factually.


Why is it a non – compliance ?

I.e., against which requirement ?



Where did it occur ?

I.e., which department or activity ?



Who ? – avoid apportioning blame.

(I.e., naming individuals)

Visit us at
www.globalmanagergroup.com
E mail:
sales@globalmanagergroup.com
Tele: +91-79-2656 5405

6.2 Human resources
6.2.1 General

Personnel performing work affecting
conformance to product requirements
must be competent on the basis of:


Appropriate education


Training


Skills

Experience

Visit us at
www.globalmanagergroup.com
E mail:
sales@globalmanagergroup.com
Tele: +91-79-2656 5405

Structure of standards as per ISO 14001-2004

4.5Checking &
corrective action
•Monitor &
Measure
•Non-conformance
•Corrective/preven
ive actions
•Records
•Audits

4.6Manag e me
re vie w

4.4 Implementation and
operation
• Structure / Responsibility
• Training, Awareness
•Communication
• EMS Documentation
• Document Control
•Operation Control
•Emergency Procedures

ronme
olicy

4.3Planning
•Environmental
Aspects
•Legal & Other
•Objectives &
Targets
•EMP

Visit us at
www.globalmanagergroup.com
E mail:
sales@globalmanagergroup.com
Tele: +91-79-2656 5405

Procedure for accident investigation

Procedure to address:

Kind of accidents to be reported

pDoetfienneti al minacjiodr enat/cnceidaer nmt,i ssh iagchc idpeonttential accident and high

When and how events should be reported and investigated

is re onsible
aWchciodent/ inscpident invefosrti gcaotinodnucting and participating in the

Who is employee representative involved in conducting
accident/ incident investigation

Whnod uwcitliln lgi aaiscec idwitht / ienxctiedrennatl iangveesntcigy/a tigoonvernment functionary
co en

Visit us at
www.globalmanagergroup.com
E mail:
sales@globalmanagergroup.com
Tele: +91-79-2656 5405

V

isit us

at

www.globalmanagergroup.com

E ma

il:

sales@globalmanagergroup.com

Tele:

+91-79-2656 540

5

  • Univers Univers
  • Ebooks Ebooks
  • Livres audio Livres audio
  • Presse Presse
  • Podcasts Podcasts
  • BD BD
  • Documents Documents