Title: Static and dynamic characteristics of a hydraulic Wheatstone ...
6 pages
English

Découvre YouScribe en t'inscrivant gratuitement

Je m'inscris

Title: Static and dynamic characteristics of a hydraulic Wheatstone ...

-

Découvre YouScribe en t'inscrivant gratuitement

Je m'inscris
Obtenez un accès à la bibliothèque pour le consulter en ligne
En savoir plus
6 pages
English
Obtenez un accès à la bibliothèque pour le consulter en ligne
En savoir plus

Description

Title: Static and dynamic characteristics of a hydraulic Wheatstone bridge mass flowmeter Authors: A. Svetea,*, J. Kutina, I. Bajsića a Laboratory of Measurements in Process Engineering, Faculty of Mechanical Engineering, University of Ljubljana, SI-1000 Ljubljana, Slovenia Andrej Svete, B.Sc., researcher (*Corresponding author): T: +386-1-4771-131 F: +386-1-4771-118 E: andrej.svete@fs.
  • results of the experimental analysis
  • hydraulic bridge
  • measuring range
  • mass flow rate
  • differential pressure
  • flowmeter
  • potential linear-flowmeter solution for direct mass flow measurements
  • electromagnetic flowmeter output
  • model
  • flow

Sujets

Informations

Publié par
Nombre de lectures 56
Langue English

Extrait

Spears Group
Refurbish an area of B Floor in the Physics building to enable the Spears Group to move from their current location in the Infolab 21 building.
LEC 2A
Perimeter Road Resurfacing
Activity
New Energy Centre
John Lee
Project
Peter McMullen p.mcmullen@lancaster. ac.uk Contractor – Rotary North West
Complete. Human Resources moved into the refurbished building 11 November 2011.
Suzanne Parkinson Contractor – Whitfield & Brown
Complete
Peter McMullen Contractor – Piningtons
Recently completed Recently completed Recently completed Recently completed
Projects onsite Projects onsite Projects onsite Projects onsite Projects onsite Projects onsite
A refurbishment project to upgrade and reconfigure the internal layout of the old Computer Centre for the Human Resources department.
th Updated 4 January 2012
Facilities Project Manager
Worked completed and furniture installed.
Creation of a new spine entrance into the Faculty of Health and Medicine and Lancaster Environment Centre. Also included is the refurbishment of Biology lecture theatre.
Timeframe
Chris Maughan Contractor – Piningtons
John Lee
Complete
CHP commissioning is currently behind programme due to issues encountered with the gas supply.
Resurfacing of the perimeter road around campus.
The existing boiler house is being refurbished to create a new energy centre to accommodate high efficiency gas boilers, a Combined Heat and Power (CHP) unit, cold water storage and associated ancillaries. The building management systems and control will also be upgraded. The CHP will provide approximately 20% of the University’s electricity requirements.
ISG – George Fox
Building works complete. End users to be moved over.
Complete
John Lee
Complete
Computer Centre Refurbishment to relocate HR permanently
Access improvements to the underground services spine duct.
Projects Summary
Spine Duct refurbishment