SR-2 Freeway Terminus Improvement Project - Component Comment Sheet
1 page
English

SR-2 Freeway Terminus Improvement Project - Component Comment Sheet

-

Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres
1 page
English
Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres

Description

Terminus ALTERNATIVE 5 ALTERNATIVE 5A ALTERNATIVE 5B ALTERNATIVE 6A ALTERNATIVE 6B (as drawn by EPCAC) Component • SR-2 On and Off Ramps Shifted East • SR-2 On and Off Ramps Shifted East • SR-2 On and Off Ramps Shifted East • SR-2 On and Off Ramps Shifted East • SR-2 On and Off Ramps Shifted East Terminus • Standard Lane Widths Provided, with • Standard Lane Widths Provided, with • Standard Lane Widths Provided • Standard Lane Widths Provided • Standard Lane Widths Provided Configuration Non-Standard Shoulder and Median Non-Standard Shoulder and Median Widths • Landscaped Median Provided Both North Landscaped Median Provided Both North Widths Required Required and South of Terminus and South of Terminus • 3 SB Lanes Off SR-2 (including non- • 3 SB Lanes Off SR-2 (including non- • 3 SB Lanes Off SR-2 (including non- • 3 SB lanes Off SR-2 (+ 1 Exclusive Right • 3 Southbound Lanes Off SR-2 (+ 1 Traffic Flow exclusive right turn movement to NB exclusive right turn movement to NB exclusive right turn movement to NB Turn Lane onto NB Glendale Boulevard Exclusive Right Turn Lane onto North Glendale Blvd.) Glendale Blvd.) Glendale Blvd) merging beyond Glendale/ Fargo/ Bound Glendale Boulevard merging • 2 NB Lanes to SR-2 • 2 NB Lanes to SR-2 • 2 NB Lanes to SR-2 Waterloo intersection) beyond Glendale/ Fargo Waterloo intersection) • 2 NB Lanes to SR-2 • Signals at Glendale/Fargo, Glendale/ • Signals at Glendale/Fargo, Glendale/ • Signals at Glendale ...

Informations

Publié par
Nombre de lectures 105
Langue English

Extrait

Terminus ALTERNATIVE5 ALTERNATIVE5A ALTERNATIVE5B ALTERNATIVE6A ALTERNATIVE6B (as drawn by EPCAC)Component SR2 On and Off Ramps Shifted EastSR2 On and Off Ramps Shifted EastSR2 On and Off Ramps Shifted EastSR2 On and Off Ramps Shifted EastSR2 On and Off Ramps Shifted East Terminus Standard Lane Widths Provided, withStandard Lane Widths Provided, withStandard Lane Widths ProvidedStandard Lane Widths ProvidedStandard Lane Widths Provided Configuration NonStandard Shoulder and MedianNonStandard Shoulder and Median WidthsProvided Both NorthLandscaped MedianProvided Both NorthLandscaped Median Widths Requiredand South of TerminusRequired andSouth of Terminus 3 SB Lanes Off SR2 (including non3 SB Lanes Off SR2 (including non3 SB Lanes Off SR2 (including non3 SB lanes Off SR2 (+ 1 Exclusive Right3 Southbound Lanes Off SR2 (+ 1 Traffic Flow exclusive right turn movement to NBexclusive right turn movement to NBexclusive right turn movement to NBTurn Lane onto NB Glendale BoulevardExclusive Right Turn Lane onto North Glendale Blvd.)Glendale Blvd.)Glendale Blvd)merging beyond Glendale/ Fargo/Bound Glendale Boulevard merging 2 NB Lanes to SR22 NB Lanes to SR22 NB Lanes to SR2Waterloo intersection)beyond Glendale/ Fargo Waterloo Signals at Glendale/Fargo, Glendale/Signals at Glendale/Fargo, Glendale/Signals at Glendale/Fargo, Glendale/SRintersection)2 NB Lanes to SR2 SR2 and Glendale/Allesandro(LeftSR2 and Glendale/Allesandro2 and Glendale/AllesandroSignals at Glendale/Fargo, Glendale/SR2 Northbound Lanes to SR2 Turn Lane Provided from SB Glendale2 and Glendale/AllesandroSignals at Glendale/Fargo, Glendale/SR2 Blvd to NB SR2)and Glendale/Allesandro(Left Turn Lane Provided from SB Glendale Blvd to NB SR2) On Street Parking OnlyOn Street Parking OnlyOn Street Parking OnlyOn Street Parking OnlyOn Street Parking Only Community Flyover structure from SB SR2 reused forContinuous sidewalk connectionContinuous sidewalk connectionContinuous sidewalk connectionContinuous sidewalk connection Access pedestrian access to bridge and overprovided along west side of Glendaleprovided along west side of Glendaleprovided along west side of Glendaleprovided along west side of Glendale Glendale BlvdBlvd, between Waterloo and Duane, alongBlvd, between Waterloo and DuaneBlvd, between Waterloo and DuaneBlvd, between Waterloo and Duane Pedestrian connectivity enhanced byPedestrian connectivity enhanced byPedestrian connectivity enhanced bywith ridge top connection added crosswalks at Glendale & Duane,added crosswalks at Glendale & Duane,added crosswalks at Glendale & Duane,Pedestrian connectivity enhanced by and Allesandroand Allesandroand Allesandroadded crosswalks at Glendale & Duane, Flyover structure from SB SR2 modifiedFlyover structure from SB SR2 replacedAdditional leg of crosswalk added atand Allesandroand reused for pedestrian access to bridgewith at grade pedestrian access to bridgeGlendale/Waterloo/Fargo Intersection toAdditional leg of crosswalk added at Glendale/Waterloo/Fargo Intersection toand over Glendale Blvdfacilitate pedestrian access to new openand over Glendale Boulevard  spacearea north of Glendale Blvdfacilitate pedestrian access to new open space area north of Glendale Blvd Glendale Blvd. Bridge Retained forGlendale Blvd. Bridge Retained forPart of Glendale Blvd. Bridge Retained forGlendale Blvd. Bridge & Flyover RemovedGlendale Blvd. Bridge & Flyover Removed Open Space Community Reuse.Larger communityCommunity Reuse and Greening.Larger CommunityReuse and Greening.ViewOpen space area north of Glendale Blvd isLinkage to north to Los Angeles River is gathering/view space is created on thecommunity gathering/view space is createdterrace created on the part of the bridgerevegetated with a naturalized landscape.possible bridge. onthe bridge.retained. Evokesthe natural setting of the community,Passive open space/gathering areas are Linkage to north to Los Angeles RiverLinkage to north to Los Angeles River isLinkage to north to Los Angeles River islike the revegetation/pocket parks along theprovided at grade in areas north and is possiblepossible possibleLos Angeles River.New atgrade opensouth of Glendale BlvdPassive open space and court/playPassive open space is provided in areasPassive open space is provided in areasspace provided south of the Glendale Blvd facilities are provided in areas north andnorth and south of Glendale Blvdnorth and south of Glendale Blvdwell as south of Glendale BlvdLinkage to north to Los Angeles River is possible TradeOffs TradeOffsTradeOffsTradeOffsTradeOffsNo Landscaped Median/Parkway Treatment isWith bridge structure retained, there is notWith bridge structure partially retained,Community green space functions more as aLeft turn movement in the Glendale/SR2 possible on Glendale Blvd or SR2 terminus intersection will significantly reduce throughthere is not sufficient width tovisual amenity than as park or gatheringsufficient width to accommodate a NonStandard shoulder and median widths flow, while increasing volume or being aLandscaped Median/Parkway Treatment onspace. This would decrease the burden ofaccommodate a Landscaped may not be accepted by Caltrans Glendale Blvd or SR2 terminusMedian/Parkway Treatment on Glendalepark space maintenance.traffic attractor to the terminus. Flyover structure would need to be modified to onStandard shoulder and median widthsBlvd or SR2 terminusLandscaping in the median north of the SR2Landscaping in the median north of the SR2 N come to grade further north of existing may not be accepted by Caltransterminus would require special agreementterminus would require special agreementThere may be structural engineering location, and to reduce slope of ramp, which is with Caltranswith Caltranscomplications in partial demolition of theFlyover structure would need to be modified too steep to accommodate ADA access as to come to grade further north of existingbridgebuilt location, and to reduce slope of ramp,Continuous sidewalk connection is not provided along west side of Glendale Blvd,which is too steep to accommodate ADA between Waterloo and Duaneaccess as builtLeft turn lane/arrow from SB Glendale Blvd to Retaining the bridge structure would require NB SR2 is not possible if bridge remains in regrading the slope east of the SR2, place adjacent to Allessandro, and removing the Retaining the bridge structure would require existing landscaping along the Allessandro regrading the slope east of the SR2, adjacent edge to Allessandro, and removing the existing landscaping along the Allessandro edge
  • Univers Univers
  • Ebooks Ebooks
  • Livres audio Livres audio
  • Presse Presse
  • Podcasts Podcasts
  • BD BD
  • Documents Documents