MASTER PLAN UPDATE  REVIEW FORM - Finance
4 pages
Français

Découvre YouScribe en t'inscrivant gratuitement

Je m'inscris

MASTER PLAN UPDATE REVIEW FORM - Finance

-

Découvre YouScribe en t'inscrivant gratuitement

Je m'inscris
Obtenez un accès à la bibliothèque pour le consulter en ligne
En savoir plus
4 pages
Français
Obtenez un accès à la bibliothèque pour le consulter en ligne
En savoir plus

Description

MASTER PLAN UPDATE REVIEW FORM - Finance

Informations

Publié par
Nombre de lectures 50
Langue Français

Extrait

Minnesota State Colleges and Universities
DRAFT 12-28-09
PREDESIGN REVIEW FOR NON-ACADEMIC Facilities
(including Revenue Fund Projects)
Institution:
Review Status :
% Review
Project Name:
Consultant:
Reviewed by:
Sally Grans-Korsh
651-296-7083
sally.grans@so.mnscu.edu
Date Received:
Date Reviewed:
1.
SUMMARY STATEMENT
Summarize the basic data: the scope, cost and schedule that details the program delivery of the
what, where, who, how, why and when that also includes evaluation of alternative solutions for the
scope, cost and schedule.
Brief description of proposed program
that describe scope of work, operational programs affected,
project size in gross square footage, and major components of the work.
Highlight major facilities issues impacted
(deferred maintenance or renewal issues, space utilization
improvement, sustainability, B-3 guidelines adherence, renewable energy and FCI addressed in the
project scope)
Construction cost and Project Cost breakdown
relating to demolition, new construction, renovation and
renewal.
Funding breakdown:
briefly note Business Plan and ability to fund project.
Include average cost per
FYE or other structure of payment.
Project schedule
including milestone dates and funding sources for the project.
Include brief summary of the alternative or options evaluated
There are many potential solutions to any given problem; the most appropriate solution may vary
depending on priorities, schedule or timing, and amount of available funds.
Predesign should present
a series of potential options for delivering the academic program.
Intention of the predesign is to
examine alternatives to delivering the scope in a variety of potential different scope and cost
alternatives.
:
Note letters from the student consultation process, president and consultant (with appropriate
registration numbers) to be included in the final 90% review.
Consultant:
Synthesize
document
Campus:
Provide,
data, assist,
note
consultation,
business plan,
review and approve
document
Reviewer’s Comments:
2.
PROJECT BACKGROUND NARRATIVE - SCOPE
Summary of the project scope based on the following:
Provide brief statement relating to the project process
, planning process, student consultation,
participants and significant outcomes during the process, operational programs, relationship to deferred
maintenance and upcoming renewal needs, strategic plan, course schedule related to the project, learning
or workforce and economic vitality.
Facilities Master Plan
– note the graphic relationship between this project and Master Plan.
If proposed
scope and project varies significantly from Master Plan then additional information may be required.
Include supporting data
, analysis or studies which support the proposed program and need; summary of
surveys, market data, enrollment, workforce, regional issues, etc.
Facilities systems summary
; include deferred maintenance backlog, FCI (Facilities Condition Index) of
campus and affected buildings.
FCI = deferred maintenance/current replacement value, and future
renewal needs data obtained from the FRRM, Facilities Reinvestment Renewal Model.
Space utilization analysis
; based on current and proposed conditions, include any pertinent data sheets.
Sustainability highlights
; note sustainable concepts and specifics or potential impact the campus is
engaged that may impact this program or project.
Include alternatives or options
that have been evaluated for this program delivery.
List any alternative
program delivery, site, leasing or building options that been studied or explored.
Include photos
of proposed renovation area or potential new area location.
Consultant:
Gather
information,
analysis, synthesis,
review document
Campus:
Provide
documentation,
business plan
analysis,
review
document
Reviewer’s Comments:
  • Univers Univers
  • Ebooks Ebooks
  • Livres audio Livres audio
  • Presse Presse
  • Podcasts Podcasts
  • BD BD
  • Documents Documents