Mine Safety and Health Administration (MSHA) - Federal Register Document E7-8882 - Proposed Information
2 pages
English

Mine Safety and Health Administration (MSHA) - Federal Register Document E7-8882 - Proposed Information

Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres
2 pages
English
Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres

Description

Federal Register/Vol. 72, No. 89/Wednesday, May 9, 2007/Notices 26427 apply for Trade Adjustment Assistance under that the workers’ firm did not produce a manual for Boiler and Pressure Vessels Section 223 of the Trade Act of 1974.’’ an article within the meaning of Section Inspectors, 1979. 222 of the Trade Act and that the Title 30 CFR 56.13030 and 57.13030 Signed at Washington, DC this 2nd day of require that fired pressure vessels workers did not provide services in May 2007. (boilers) be equipped with safety direct support of an affiliated TAA Elliott S. Kushner, devices approved by the American certified firm. Certifying Officer, Division of Trade Society of Mechanical Engineers On May 14, 2004, the Department Adjustment Assistance. (ASME) to protect against hazards from filed its second consent motion for [FR Doc. E7–8825 Filed 5–8–07; 8:45 am] overpressure, flameouts, fuel voluntary remand. The Department BILLING CODE 4510–FN–P interruptions and low water level. issued a negative determination on Sections 56/57.13030 requires that remand on August 2, 2004. The records of inspections and repairs be Department’s Notice of determination DEPARTMENT OF LABOR retained by the mine operator in was published in the Federal Register Mine Safety and Health Administration accordance with the requirements of the on August 10, 2004 (69 FR 48527). The ASME Boiler and Pressure Vessel Code determination was based on findings Proposed Information Collection and the ...

Informations

Publié par
Nombre de lectures 37
Langue English

Extrait

Federal Register/ Wednesday,May 9, 2007/ Vol.72, No. 89/ Notices
26427
apply for Trade Adjustment Assistance under that the workersfirm did not producea manual for Boiler and Pressure Vessels Section 223 of the Trade Act of 1974.’’an article within the meaning of SectionInspectors, 1979. Title 30 CFR 56.13030 and 57.13030 222 of the Trade Act and that theSigned at Washington, DC this 2nd day of workers did not provide services inMay 2007.require that fired pressure vessels direct support of an affiliated TAAElliott S. Kushner,(boilers) be equipped with safety devices approved by the American certified firm.Certifying Officer, Division of Trade On May 14, 2004, the DepartmentAdjustment Assistance.Society of Mechanical Engineers filed its second consent motion for(ASME) to protect against hazards from [FR Doc. E78825 Filed 5807; 8:45 am] voluntary remand. The Departmentoverpressure, flameouts, fuel BILLING CODE 4510FNP issued a negative determination oninterruptions and low water level. remand on August 2, 2004. TheSections 56/57.13030 requires that records of inspections and repairs be Departments Notice of determinationDEPARTMENT OF LABOR was published in theFederal Registerretained by the mine operator in Mine Safety and Health Administrationaccordance with the requirements of the on August 10, 2004 (69 FR 48527). The ASME Boiler and Pressure Vessel Code determination was based on findings Proposed Information Collection and the National Board Inspection Code that the workers at the subject facility RequestSubmitted for Public Comment (progressive recordsno limit on did not produce or support the and Recommendations; Safety retention time) and made available to production of an article by IBM and Defects, Examination, Correction, and the Secretary or his/her authorized were not under the control of BP. On Records representative. December 2, 2005, the USCIT remanded Title 30 CFR 56.14100 and 57.14100 the matter to the Department. ACTION:Notice. require equipment operators to inspect On February 6, 2006, the Department equipment, machinery, and tools that issued a second negative determinationSUMMARY:The Department of Labor, as are to be used during a shift for safety on remand. The Departments Notice ofpart of its continuing effort to reduce defects before the equipment is placed determination was published in thepaperwork and respondent burden, in operation. Defects affecting safety are Federal Registerconducts a preclearance consultationon March 2, 2006 (71 required to be corrected in a timely FR 10709). The Departments programto provide the general public manner. In instances where the defect determination was based on findingsand Federal agencies with an makes continued operation of the that the criteria developed by theopportunity to comment on proposed equipment unsafe, the standards require Department to determine the extent toand/or continuing collections of removal from service, tagging to identify which a worker group engaged ininformation in accordance with the that it is out of use, and repair before activities related to the production of anPaperwork Reduction Act of 1995 use is resumed. article by a producing firm was under(PRA95) [44 U.S.C. 3506(c)(2)(A)]. This Title 30 CFR 56.18002 and 57.180002 the control of the producing firm hadprogram helps to ensure that requested require that a competent person not been met. On March 30, 2007, thedata can be provided in the desired designated by the operator shall USCIT remanded the matter to theformat, reporting burden (time and examine each working place at least Department. financialresources) is minimized, once each shift for conditions which The Department has determined after collection instruments are clearly may adversely affect safety or health. A further review that during the relevant understood, and the impact of collection record that such examinations were period, a significant number or requirements on respondents can be conducted shall be kept by the operator proportion of the subject worker group properly assessed. for a period of one year, and shall be was separated and that the subject DATES:Submit comments on or before made available for review by the worker group was working in support July 9, 2007. Secretary or his/her authorized of, and under sufficient control of ADDRESSES:Send comments to U.S. representative. import impacted BP production Department of Labor, Mine Safety and facilities, whose workers were certified Health Administration, Debbie Ferraro,II. Desired Focus of Comments as eligible for TAA. Management Services Division, 1100 Currently, the Mine Safety and Health ConclusionWilson Boulevard, Room 2171, Administration (MSHA) is soliciting Arlington, VA 222093939. Commenters comments concerning the proposed Based on review of the record are encouraged to send their comments extension of the information collection evidence, I determine that BP controlled on a computer disk, or via Email to related to the Safety Defects, the subject worker group and that Ferraro.Debbie@dol.gov, along with an Examination, Correction, and Records. increased imports of articles like or original printed copy. Ms. Ferraro can MSHA is particularly interested in directly competitive with crude oil be reached at (202) 6939821 (voice), or comments which: produced by an affiliated facility which (202) 6939801 (facsimile). Evaluate whether the proposed the subject worker group supported, FOR FURTHER INFORMATION CONTACT:collection of information is necessary contributed to the total or partial Contact the employee listed in thefor the proper performance of the separation of a significant number or ADDRESSESfunctions of the agency, includingsection of this notice. proportion of workers at the subject SUPPLEMENTARY INFORMATION:whether the information will have facility. practical utility; In accordance with the provisions of I. Background Evaluate the accuracy of the the Act, I make the following Title 30 CFR 56.13015 and 57.13015agencys estimate of the burden of the certification: require that compressedair receiversproposed collection of information, ‘‘All workers of International Business and other unfired pressure vessels beincluding the validity of the Machines Corporation, Tulsa, Oklahoma, inspected by inspectors holding a validmethodology and assumptions used; who became totally or partially separated National Board Commission and inEnhance the quality, utility, and from employment on or after November 26, 2002, through two years from the issuance ofaccordance with the applicable chaptersclarity of the information to be this revised determination, are eligible tocollected; andof the National Board Inspection Code,
VerDate Aug<31>200518:12 May 08, 2007Jkt 211001PO 00000Frm 00095Fmt 4703Sfmt 4703E:\FR\FM\09MYN1.SGM 09MYN1
26428
Federal Register/ Wednesday,May 9, 2007/ Notices/ Vol.72, No. 89
Minimize the burden of theSTATUS:Open.NUCLEAR REGULATORY collection of information on those whoCOMMISSION MATTERS TO BE CONSIDERED:The are to respond, including through the Commission will consider and act upon[DOCKET NOS. 50498 and 50499] use of appropriate automated, the following in open session:Secretary electronic, mechanical, or other STP Nuclear Operating Company; of Laborv.Marfork Coal Co.,Docket technological collection techniques or Notice of Consideration of Issuance of Nos. WEVA 2006788R, WEVA 2006other forms of information technology, Amendments to Facility Operating 789R, and WEVA 2006790R. (Issues e.g., permitting electronic submissions Licenses, Proposed No Significant include whether an operator may of responses. Hazards Consideration Determination, maintain a contest proceeding under A copy of the proposed information and Opportunity for a Hearing collection request can be obtained bysection 105(d) of the Mine Act when it contacting the employee listed in thedoes not seek an expedited hearing.)The U.S. Nuclear Regulatory FOR FURTHER INFORMATION CONTACTCommission (NRC, the Commission) is Any person attending this meeting section of this notice, or viewed on theconsidering issuance of amendments to who requires special accessibility Internet by accessing the MSHA homeFacility Operating Licenses, numbered features and/or auxiliary aids, such as page (http://www.msha.govNPF) and then76 and NPF80, issued to STP sign language interpreters, must inform choosing‘‘Rules and Regs’’Operating Company (theand Nuclear the Commission in advance of those ‘‘Federal RegisterDocuments’’for operation of the South. licensee) needs. Subject to 29 CFR 2706.150(a)(3) Texas Project, Units 1 and 2, III. Current Actionsand 2706.160(d). respectively, located in Matagorda Inspection records denote any hazards CONTACT PERSON FOR MORE INFO:Jean County,Texas. that were discovered and how theThe proposed amendment request Ellen (202) 4349950/(202) 7089300 hazards or unsafe conditions werewould change the name of one licensee, for TDD Relay/18008778339 for toll abated. Federal inspectors use theTexas Genco, LP (Texas Genco), to NRG free. records to ensure that unsafe conditionsSouth Texas LP. The name change are identified early and corrected.Jean H. Ellen,results from purchase of Texas Gencos Currently, the Mine Safety and Health Chief Docket Clerk.parent company by NRG Energy, Inc. as Administration (MSHA) is soliciting approved by the NRC in January 2006. [FR Doc. 072321 Filed 5707; 3:19 pm] comments concerning the proposedBefore issuance of the proposed BILLING CODE 673501M extension of the information collectionlicense amendments, the Commission related to the Safety Defects,will have made findings required by the Examination, Correction, and Records.Atomic Energy Act of 1954, as amended Type of Review:Extension. (the Act), and the Commissions NATIONAL SCIENCE FOUNDATION Agency:Mine Safety and Health regulations. Administration. The Commission has made a Committee Management Renewal Title:Safety Defects; Examination, proposed determination that the Correction and Records. amendment request involves no The NSF management officials having OMB Number:12190089. significant hazards consideration. Under responsibility Advisory Committee for Number of Respondents:12,557. the Commissions regulations in Title 10 International Science and Engineering Number of Responses:11,502,241. of the Code of Federal Regulations (10 Burden Hours:have determined that renewing1,223,104. (#25104) CFR), Section 50.92, this means that Burden Cost (operating/maintaining):this group for another two years is operation of the facility in accordance $0. necessaryand in the public interest in with the proposed amendments would Comments submitted in response to connection with the performance of not (1) involve a significant increase in this notice will be summarized and/or duties imposed upon the Director, the probability or consequences of an included in the request for Office of National Science Foundation by 42 accident previously evaluated; or (2) Management and Budget approval of the U.S.C. 1861et seq.This determination create the possibility of a new or information collection request; they will follows consultation with the different kind of accident from any also become a matter of public record. Committee Management Secretariat, accident previously evaluated; or (3) Dated at Arlington, Virginia, this 4th day General Services Administration. involve a significant reduction in a of May, 2007. Effective date for renewal is May 23,margin of safety. As required by 10 CFR David L. Meyer, 50.91(a), the licensee has provided its 2007. For more information contact Director, Office of Administration and analysis of the issue of no significant Susanne Bolton at (703) 2927488. Management. hazards consideration, which is Dated: May 4, 2007. [FR Doc. E78882 Filed 5807; 8:45 am] presented below: BILLING CODE 451043PSusanne Bolton, The proposed amendment[s] would only Committee Management Officer. change the name of a licensee. The proposed [FR Doc. E78857 Filed 5807; 8:45 am]name change does not involve a significant FEDERAL MINE SAFETY AND HEALTHincrease in the probability or consequences BILLING CODE 755501P REVIEW COMMISSIONof an accident previously evaluated. The proposed name change does not create the Sunshine Act Meetingpossibility of a new or different kind of accident from any accident previously May 2, 2007. evaluated. The proposed name change does not involve a significant reduction in a TIME AND DATE:10 a.m., Thursday, May margin of safety. 10, 2007. PLACE:The Richard V. Backley HearingThe NRC staff has reviewed the Room, 9th Floor, 601 New Jerseylicensees analysis and, based on this Avenue, NW., Washington, DC.review, it appears that the three
VerDate Aug<31>200518:12 May 08, 2007Jkt 211001PO 00000Frm 00096Fmt 4703Sfmt 4703E:\FR\FM\09MYN1.SGM 09MYN1
  • Univers Univers
  • Ebooks Ebooks
  • Livres audio Livres audio
  • Presse Presse
  • Podcasts Podcasts
  • BD BD
  • Documents Documents