EB Comment Period 1-Responses edits
20 pages
English

EB Comment Period 1-Responses edits

-

Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres
20 pages
English
Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres

Description

Responses to Public Comments Received on First Coment Draft of LEED-EB Comment Period was Open: 03/01/04 - 03/30/04)Document Date: June10, 2004Proposed Issue Date Changes to LEED- Type of Category Comment # Credit Likes and Dislikes Ways To Improve Language Changes ResponsesSummaries Submitted EB for Second ChangeComment DrafttPrereq 1 The person responsible for the ongoing Make changes ClarificationNeed to define who can sign off. Is this Sign off (Erosion & There is a requirement for "Sign implementation of this plan within the organization included in SS SSp1-Com1 the permitting agency, architect, civil Define who. 2/12/2004responsibility Sedimentation off of the erosion control plan" that owns / operates the building. Response Columnengineer or who.Control)This prerequisite requires Erosion and sedimentation control can be No Change Noneconsiderable expense to achieve implemented for vegetated areas and for hard Prereq 1 It should be a credit where sites are 30% for sites that are not mostly surfaced areas. Required level of (Erosion & or more vegetated and NA to mostly SS SSp1-Com2 paved. It is NA to sites that are 2/12/2004achievement Sedimentation paved sites. Would be fair to facilities mostly paved except for the Control) trying to maintain green space.construction requirement which is covered elsewhere.This prerequisite requires a policy designed to No Change NoneThere are few things I am prevent erosion and sedimentation and address ...

Informations

Publié par
Nombre de lectures 20
Langue English

Extrait

Responses to Public Comments Received on First Coment Draft of LEED-EB Comment Period was Open: 03/01/04 - 03/30/04) Document Date: June10, 2004 CategoryComment #ISsusmuem ariesCreditLikes and DislikesWays To ImproveLanguage ChangesSDuatbem itted Prereq 1 off SSSSp1Com1rSeisgpno nsibility(SEerdoisimoenn t&a tion Tofhf eorfe  tihse  ae rreoqsiuoirne cmoenntrt oflo rp l"aSni"gn teNhneege ipnd eetreor mditoterif niwgn hea ogw.ehnoc cy,a na rscihgitne ocftf,.  cIisv itl his Define who.2/12/2004 -Control) This prerequisite requires Prereq 1 considerable expense to achieve SSSSp1-Com2Reaqchuiireevde lmeevnelt o(SEerdoismioenn t&at ion fpoarv seitde. sIt  tihs atN aAr teo  nsoitt ems othstalty  are Iot rs hmoourel dv beeg eat actreedd iat nwdh eNrAe  tsoi temso astrley  30% Control)cmoonssttlryu cptaiovne dr eeqxucireeptm feonr tt hweh ich is tprayivnegd  tsoi temsa.i nWtaoiunl dg rbeee fna isrp taoc fea.cilities 2/12/2004 covered elsewhere. There are few things I am confused about. The Introduction states that, LEED for Existing Buildings is a set of performance standards for the Erosion and Sedimentation Control is a sustainable operation of existing sound requirement, but in an existing buildings. That said, following th building, the landscaping maybe just fine Prereq 1 format of the LEED-NC doesnt SSSSp1-Com3MackreeditSedimentation caolwnsaytrsu cmtiaokne  asnedn smea. jIonr  new awsh iesr. eT rwuoer,k t ihse rnee ecdoeuldd  sbuec hs itausa itino SnsS  Put Prereq 1 under SS Credit 5 this a (Erosion & Control)grievneonv astoi oenrso,s isoitne  cdoisntturrobl anneceed iss t oa  rwCehraielsedoi ttn h,5 et t hhwisao tr pkrwi elilsr r eebqqeuiuinsirgite e deosrnhoeos.iu olFdno  rbc otehcntaort oml e wocfoofrentkrri oinls g  wbahe iepnnogi  nvdta orwinoheu.esn  tuyspiensg  oefr soistieo n & 2/12/2004 be addressed. In EB, this Prereq a credit under this category so it is done 1 indicates that erosion is going t when the landscaping work is done. be a problem right from the start yet it is a existing building so the site maybe fine. Therefore, Erosion & Sedimentation Control should not be a prereq. Consider simplifying the documentation requirements. For example, stipulate that the organizational policy include an outline of the erosion control measures t 4Submission (PErerroesiqo n1  & Erosion is a perpetual process sbueb immipslesimone notfe ad  annadr rfaotrivgeo t (h1e) , and copSmall formatting error on line: For SS SSp1-Com that requires a building manager' RequirementsSCeodnitrmoel)ntation attention over the life the building.odcfro escidugitnm,  ewofnoftau.l tidTo oint   rbLeedE uEacpDep  rtwohilelp r rileaoctaeed it vooe f  rfeoqr utheisst  raenqyu icroend.struction projects no box 2/12/2004 just the "declaration of compliance" (a LEED Letter Template, perhaps) and require the "log" and "photos" to be held in the case of a LEED audit? Ø This requirement addresses erosion on the site during construction. If an erosion problem begins during operation (i.e. not as a result of cons Prereq 1 truction) how is it to be SSSSp1-Com5Edrorision control (Erosion & aaddddrruieerssesseedd ?ut  nPdeerrh tahpes  tphlias nc an be u ng operation Sedimentation req men s Control)Ø Also, not cl. e ar in initial submittal, what steps are require to identify and address erosion & sedimentation problems during operations of building. SSPR1: the requirement languag Prereq 1 seems to be redundant and Erosion & SSSSp1-Com6Editorial(Sedimentation Asrheo ualsd  tbhee  tsigehctoennde da nifd  ptohisrsdi ble.  Control) sentences just a reiteration and provisions in the EPA document
Proposed ResponsesECBh afonrg eSse tcoo LnEd ED-TCyhpaen ogfe Comment Draft The person responsible for the ongoing Make changes Clarification implementation of this plan within the organizationincluded in that owns / operates the building. Response Column Erosion and sedimentation control can be No Change None implemented for vegetated areas and for hard surfaced areas. This prerequisite requires a policy designed to No Change None prevent erosion and sedimentation and address any erosion or sedimentation problems that develop under routine operation and when construction projects occur on the building site. This is prerequisite only requires changes to the site if they are needed to prevent or solve erosion and sedimentation problems.
An on-line reporting system is being developed forMake changes Editorial LEED-EB reporting. In the interim, LEED-EB will included in use word documents as has been done during th Response Column pilot. The formatting error will be corrected.
The requirements address erosion and No Change None sedimentation control during operation.
The EPA document cited addresses erosion and No Change None sedimentation control during construction. The second sentence refer to operational erosion and sedimentation control and the third sentence refers to erosion and sedimentation control during construction.
SSSSp2-Com1BHuiilsdtionrigcs 
Negative environmental SS SSp2-Com2 impact of building age requirement
SS SSp2-Com3 Age of Building e SSSSp2-Com4breuiqlduiirneg maegnt Negative environmental SS SSp2-Com5 impact of building age requirement
2/12/2004
Please review the proposed changes to SSp2. Please review the proposed changes to SSp2.
A significant number of additional Please see responses to General Comment 5. No Change None The rating system doesn't make Create a category for historically pointosp srihatoue ldre bhae bailwitaatridoend  offo rh itshteo ric provision for the cultural value of significant buildings. Provide a significant baupilpdrings. Not just because of the  building. I fear that the LEED number of points for projects that Prereq 2 (Age of rating system will be just one Building)pmroorpee rrteiaess oann tdo/ otrh rtehaetire nc hhairstaocrtiecr  pbrueilsdeirnvgse.,  rTehset oLrEe EorD  rreahtianbgil istaytset ehmis toric caeolsmmob mobdueinceiadcu aesteen  eiornfgf toyh rtemhirea tyai obrineli tptyro e tfsou etuntr,e  but 2/12/2004 defining features (roofs, exterior doesn't appear to recognize the generations that modern buildings significance of historic buildings, fiannids hs imgnaitfiecriaanlts ,i nwtienridoor wssp,a dcoeos.rs) structures and landscapes.Pcaarnkn oSt.e rCviocnes tuolt  ewsittha btlhise h Nmateioannianl gful language to be included.      Core group for formulating an excellent LEED EB rating system. We represent the Indian Green Building Council, which is part of the CII-Godrej Green Business Centre, Hyderabad, India. We are happy to share with you that the LEED green building rating system is advancing in India at a rapid pace. There would be at least 10 LEED rated NC buildings in India by end of this year. However, there are a number of other existing buildings in India Age of the building should be a maximu Prereq 2 (Age of rwehgoi satreer  feovri tnhcien Lg EgEreDa tE iBn.t eTrheest  to soaf 1v et op r2e ycieoaurss .r eOsthoeurrcweiss ei so lpopsot rftourn i5t y to Building) age of these building vary from 6 months to 2 years. In the above good years. context, we feel that the age of the building, which is proposed a 5 years to register a project is on the higher side. Our submission i that projects which are not registered under the LEED NC should be given a time frame of 1 year of operation instead of the proposed 5 years. This following are the reasons: 1.Acquiring green image after 5 long years is not a positive incentive. 2.Best operating and maintenance This must receive higher points as this is LEED-EB strives to put all buildings, regardless o No Change None Ibnucilludisinogn i so fc raitgice afl oirn  eexvisatliunagt ing ththe essence of adaptive re-use or age, on a path towards exceptional environmental restoration, renovation or conservation Site Selection: Identify impact on performance. Newer buildings are likely to be able BPurielrdeinq g2) (Age of tereextcsehonnudor lctoehgsei  crsaeulq sruteialrieenvdaa tbnoilc itcey o trtorherwcota urogdr hs  for social, cultural or other functional tex iaslttinerge fdl/o rrae n&o fvaautenda/  oaf dtdhee ds iutes ed tuoe  2/12/2004to reach these high performance standards sustainability. The site alterations may b o sooner than older buildings as older buildings will limited to and dependent upon the the building. likely require several cycles of facility satdajnudstarmdesn.ts based upon current appropriate 'fit' for extending the improvements to achieve high performance sustainability of the building or site. standards. Please see response to comment SSp2-Com2. See response to The idea that a building needs 'fCrohamn 3g et ot h5e  yweoarrsd inolgd 'o ifn ' 5t hyee saresc tiooldn'  to 'CfRrhoeaqmnu ig3re et tomh 5ee n ytweso.a rrdWsi nhoygl d io' mfi n'p5 to hryteea asnrte:s c tToilhoden'  :t cCoommm2ent SSp2-some age before being LEED EB Potential Technologies & Strategies. this sooner a building begins to become Prereq 2 (Age of certified is a good approach. Building)iHncoewnetivveer ,t iot  hwaovueldb suieldeimn gtso  lbees sa n wcdeoornutilfedi  esedon  tucoo ndudroea rs goLe E atEhnodDs  tNeh oCws hewo itl lh hnaatov teh d anov oest  o iswnuofsoutrladmi ntaaatibkoleen   sianon mod pe metriaamktieeo  tcno ht haaecn qgbueeisrt teee tvr.he Ient   2/12/2004  than 5 years old to apply to become LEED EB certifiedaanrryivweady  fruontmil  tah per 5a cytiecaarl  pstearinoddp hoianst .byuoilud isntartwead si nb uyielta. rT ohnree eafter the g years seem reasonable. Revise the requirement that Please see response to comment SSp2-Com2.cSoeme mreesnptoSnSsep 2t-o buildings not certified under LEE NC must be at least 5 years old Com2 before they can make application Consideration should be given to a for certification under LEED-EB. This means buildings built in 2001graduated scale for building age to Prereq 2 (Age of cEoBu lud nntilo t2 b0e0 6c. eTrtihfiee ed nvuinrodnerm LeEntEal ps2rt0oo0cm5k,o  it4ne t yot heLea rEisnE-c Dl2u-0Es0iB6o  nsa unodfc  hn5 eayews:ae (rrs 3 b yu2iela0dir0ns7 g) .  2/12/2004 Building) impact of LEED-EB is much wide that LEED-NC, due to the size of pMaartn oyf  LaE fEacDil-itEieBs  cerendviitrso narmee onr tcala n be the existing building market and management system such as ISO14001 building life. LEED-NC has its . greatest impact on one-time environmental construction impacts.
  • Univers Univers
  • Ebooks Ebooks
  • Livres audio Livres audio
  • Presse Presse
  • Podcasts Podcasts
  • BD BD
  • Documents Documents