Missions d Audit
4 pages
English

Missions d'Audit

-

Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres
4 pages
English
Le téléchargement nécessite un accès à la bibliothèque YouScribe
Tout savoir sur nos offres

Description

ing’europ group Private Company with registered capital 3 000 000 €Administrative office : RCS LYON N° B351379417BP 1231 General manager : M. MARKARIAN 26012 VALENCE CEDEX - FRANCE Technical manager : A. CSIKEL Head office : 26 Chemin de la Forestière – 69 130 ECULLY - FRANCE Administrative manager : P. COUDOUR Phone : 00.33.4.75.40.99.98 / Fax : 00.33.4.75.55.77.81 AUTOMOTIVE INDUSTRY REFERENCES ING’EUROP Group composed by 90 graduated engineers and technicians, has acquire a strong experience in technical start-up, the reliability improvement before and after starting-up in all kind of industrial plant. You’ll find below a resume of the main commissioning realized in starting-up and reliability improvement of automotive industry. )))))ing’europ group For “REGINOV at RUEIL MALMAISON” : For “RENAULT BOULOGNE BILLANCOURT” : Studies on electrical motor (EXPRESS car), tests and feasibility Projects follow-up relating to installation of new or renovated demonstrations for the generators to be used in the car : equipments in order to improve the existing pressing lines in - drawing-up of technical documents of current generator, FLINS and SANDOUVILLE : - assisting to adaptation of current generator to lead-frost - call for bids, consultation and manufacturers choices, battery, schedule follow-up until implementation on site. - assisting to drawing-up of detailed functional analysis of Pressing machine erection and commissioning ...

Informations

Publié par
Nombre de lectures 27
Langue English

Extrait

ing’europ group
Private Company with registered capital 3 000 000
RCS LYON N° B351379417
Administrative office
General manager
: M. MARKARIAN
Technical manager
: A. CSIKEL
Administrative manager : P. COUDOUR
:
BP 1231
26012 VALENCE CEDEX - FRANCE
Head office :
26 Chemin de la Forestière – 69 130 ECULLY - FRANCE
Phone : 00.33.4.75.40.99.98 / Fax : 00.33.4.75.55.77.81
AUTOMOTIVE INDUSTRY
REFERENCES
ING’EUROP Group composed by 90 graduated engineers and
technicians, has acquire a strong experience in technical start-up, the
reliability improvement before and after starting-up in all kind of
industrial plant.
You’ll
find
below
a
resume
of
the
main
commissioning
realized
in
starting-up
and
reliability improvement of automotive industry.
ing’europ group
)
For “REGINOV at RUEIL MALMAISON” :
Studies on electrical motor (EXPRESS car), tests and feasibility
demonstrations for the generators to be used in the car :
-
drawing-up of technical documents of current generator,
-
assisting to adaptation of current generator to lead-frost
battery,
-
assisting to drawing-up of detailed functional analysis of
current generator,
-
study of power switch system for high frequency generator.
Assisting to realisation of a numeric control system to drive a
DC current motor :
-
studies of logic diagram for start-up and shutdown,
-
study
of I/O control system for interface with outside,
XR25...
-
performances controls for the system,
-
study of system adaptation to AC motor control system.
For industrialization projects of “MASTER” and “EXPRESS”
cars, drawing-up of electrical car group know-how aimed to
engineering department, for the 5 main devices : electrical
motor, current generator, battery, charger, static rectifier :
-
drawing-up of technical documents,
-
functioning specifications, collecting of technical data,
follow-up of tasks,
-
drawing-up of commissioning orders,
-
drawing-up of commissioning reports and technical files.
For “MASTER” and “EXPRESS” cars projects,
Drawing-up of technical specifications for the electrical motive
equipment of the electrical car:
-
integration in RENAULT documents of overall technical
specifications set up with Thomson CSF,
)
For “RENAULT” in Car Engineering department
at GUYANCOURT :
Coordination of start-up for laser butt joint workshop at
SANDOUVILLE made of 3 machines installed in stamping
workshop :
-
assisting to erection, commissioning and acceptance tests
for 3 laser butt joint machines with the suppliers RENAULT
AUTOMATION at EVRY,
-
preparation and coordination of erection and commissioning
in SANDOUVILLE,
-
preparation and coordination of operation,
-
reliability improvement of the plant.
)
For RENAULT DOUAI :
Assistance mission for management and coordination of tasks
which follow X 64 reliability improvement relating to stamping
workshop.
)
For “RENAULT BOULOGNE BILLANCOURT” :
Projects follow-up relating to installation of new or renovated
equipments in order to improve the existing pressing lines in
FLINS and SANDOUVILLE :
-
call for bids, consultation and manufacturers choices,
schedule follow-up until implementation on site.
Pressing machine erection and commissioning follow-up for
2000 and 5400 Tons pressing machine project in MCA plant in
Maubeuge :
-
Issue of Quality Assurance plan,
-
Commissioning follow-up,
-
operational increase follow-up,
-
anomaly treatment,
-
operation follow-up.
)
For “Mécanique Construction Automobile”
MAUBEUGE :
Reliability improvement of pressing machine (PAL 166) :
-
analysis of machine operation modes : operation and
failures follow-up,
-
Actions proposals in order to improve the PAL machine,
-
Organisation of reliability improvement meetings and
drawing-up of reports,
-
Issue of data base
made of failure reports, non-
conformance reports and improvement requests (relating to
mechanics,
electricity,
automation,
hydraulic,
tools;
methods, maintenance, organisation…,)
-
technical assistance for maintenance tasks.
Improvement of cadences on pressing machine X76 :
-
issue of a follow-up system for each manufacturing
sequence,
-
follow-up of manufacturing sequence for AR X76 door ,
-
follow-up of machine non-conformances,
2000
and
5400
Tons
pressing
machine
erection
and
commissioning follow-up :
-
drawing-up of safety plan,
-
coordination of different suppliers on site,
-
drawing-up and follow-up of non-conformance on pressing
machine and on building,
-
coordination of acceptance tests for pressing machine,
-
drawing-up of acceptance tests orders for pressing machine
-
follow-up of machine non-conformances,
-
drawing-up of acceptance tests reports for PT 5400T,
-
implementation of PARETO method,
-
preparation of vacuum system tests , in order to compare
the both pressing machines performances,
-
follow-up of manufacturing sequence of hood X76 on a new
car,
-
drawing-up of a synthesis file (site historic, human needs,
specifications, unsolved problems),
-
control of functional analysis of both pressing machines
ing’europ group
For ATEIM
)
at
RENAULT BOULOGNE BILLANCOURT” :
For stamping department (Car engineering office) :
-
Projects
follow-up
and
devices
purchases
for
new
implantation : engineering, frame work for new machine in
stamping workshop of Douai and Sandouville ,
-
Pilot-study calculating,
-
Studies and issue of technical specifications, low-cost
feasibility studies,
-
consultation of suppliers (call for bids and offers),
-
suppliers choice with customer’s purchase department,
-
Follow-up with schedule,
-
Coordination
between
departments
(manufacturing,
maintenance...,),
-
Financial follow-up,
-
Technical follow-up on site.
For coach building erection department :
-
follow-up of projects relating to layout of new or renovated
equipments
for
modernisation
of
pressing
lines
in
Maubeuge:
drawing-up of technical specifications and call for bids,
technical link between plant departments and central
method department in Billancourt,
follow-up of the schedule,
follow-up of equipments erection.
)
at
RENAULT DOUAI” :
Erection and commissioning for MAP stamping press (2000 Tons
and 5400 Tons) :
-
drawing-up and follow-up of press erection schedule with
“OPEN PLAN”,
-
erection follow-up,
-
press acceptance tests,
-
commissioning follow-up,
-
operational increase follow-up,
-
anomaly treatment,
-
control of maintenance and orders documents,
-
training for RENAULT operation staff,
-
follow-up the front door fabrication for TWINGO,
-
follow-up the cover lining for X 54 SAFRANE.
For PT 5400T maintenance department:
-
assistance to maintenance organisation,
-
organisation and follow-up of periodic controls,
-
follow-up of performance tests
-
preparation of maintenance tasks.
Layout of new or renovated devices :
-
Instalment of a PAVAR press in hall A2,
-
Instalment of a test press in hall A14.
Reliability improvement of 5400 T press :
-
Inventory of problems,
-
Classification of problems according to operation and quality,
-
information to concerned departments,
-
solutions proposal.
)
at
RENAULT MAUBEUGE” :
Project follow-up for automation and electricity of PT 5400 T :
-
wiring follow-up,
-
listing preparation for acceptance controls,
-
assistance to acceptance checks and problems inventory.
varnish coating unit
ing’europ group
Painting units
For ABB FLEXIBLE AUTOMATION
)
at
CITROEN RENNES” for the installation of a painting
distribution project.
)
at
PEUGEOT POISSY” for the installation of a painting
distribution project.
)
at
RENAULT DOUAI” for project of a P2 protection system
(Blackson type)
)
at
BOURBON Automobile” for painting installation project
(conveyor, cabins, drying oven, robot, distribution, air
treatment)
)
at
MATRA Automobile” ROMORANTIN LANTHENAY
Painting
installation
projects
management
(conveyor,
air
treatment, painting cabin, drying ovens, robots, distribution) as
project leader in painting application department :
-
Drawing-up specifications,
-
orders,
-
subcontractors follow-up,
-
coordination of all project leaders,
-
issue and follow-up of assembly and commissioning
schedules,
-
drawing-up of commissioning orders,
-
supervising studies.
Site manager in painting application department for erection
and commissioning of conveyor, air treatment, painting cabin,
hatch (piping, electricity, automation, mechanics, pneumatic,
ventilation):
-
work site organisation,
-
management of working teams,
-
coordination of the assembling,
-
subcontractors follow-up,
-
issue
and
follow-up
of
erection
and
commissioning
schedules,
-
drawing-up of commissioning orders.
Site manager and piping design in paint coating department for
erection and commissioning of painting distribution equipments
(piping,
electricity,
automation,
mechanics,
pneumatic,
hydraulic):
-
design of piping networks,
-
work site organisation,
-
management of erection teams,
-
coordination of erection tasks,
-
subcontractors follow-up,
-
issue
and
follow-up
of
erection
and
commissioning
schedules,
-
drawing-up of commissioning orders,
-
staff recruiting.
For “ALSTOM Air Industrie Système”
)
at
VOLVO GAND” in Belgium :
End of erection tasks supervision and commissioning :
-
issue of listing relating to end of erection tasks ,
-
coordination and management of suppliers in charge of
remaining tasks,
-
adaptation of the general schedule,
-
implementation of non-conformance reports data base,
-
implementation of commissioning organisation.
)
at
RENAULT SANDOUVILLE” :
Commissioning coordination for ALSTOM equipments : surface
treatment system, chemical treatment, ovens :
-
Commissioning
reports
with
informations
relating
to
furtherance and reservations.
For HITACHI FRANCE
)
at
RENAULT DOUAI” :
-
assistance to drawing-up of detailed functional analysis for
a 5400 tonnes pressing machine,
-
issue of logic diagrams from Designer software.
  • Univers Univers
  • Ebooks Ebooks
  • Livres audio Livres audio
  • Presse Presse
  • Podcasts Podcasts
  • BD BD
  • Documents Documents